Grant, WI interconnection queue

8 active projects totaling 950 MW in the MISO queue, plus 10 with terminal status (shown grayed).

8active projects
950active MW
18total filed
Queue IDProjectkVMWResourceStatus
G527 Not reported n/r 280 Coal Withdrawn
G139 Not reported n/r 250 Other Withdrawn
G087 Not reported n/r 200 Other Withdrawn
J139 Not reported 161 200 Wind Withdrawn
J870 Not reported 138 200 Solar Operational
J947 Not reported 138 200 Solar Operational
J3448 Not reported 161 180 Wind Active
J1928 Not reported 345 100 Battery Withdrawn
J855 Not reported 138 100 Wind Active
J871 Not reported 138 100 Solar Active
J1374 Not reported 138 95 Wind Active
J1708 Not reported n/r 75 Solar Withdrawn
G076 Not reported n/r 52 Other Withdrawn
G953 Not reported 69 50 Wind Withdrawn
G954 Not reported 69 50 Wind Withdrawn
J084 Not reported 69 50 Wind Withdrawn
J1000 Not reported 138 50 Solar Operational
S1023 Surplus; J1000 138 25 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.