MISO request J855

MISO queue ID J855

Queue request J855 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW wind project in Grant County, WI, according to Berkeley Lab’s queue data file. The filing names Lancaster - Eden Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 6, 2020.

Queue IDJ855
Project nameNot reported
Status (as published)Active
SubstationLancaster - Eden Line Tap
Point of interconnectionLancaster - Eden 138 kV Line Tap
CountyGrant
StateWI
Voltage138 kV
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2020-11-06
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grant, WI: 18 requests in the MISO queue, 8 active totaling 950 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAmerican Transmission Co.
ClusterDPP-2017-AUG East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2017-06-16
Interconnection agreement date2019-11-14
Operational date2023-04-04

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.