Substation Scout

Surplus; J1000

MISO queue ID S1023

Surplus; J1000 (S1023) was listed in the MISO interconnection queue at the end of 2025 as a 25 MW hybrid project in Grant County, WI, according to Berkeley Lab’s queue data file. The filing names Nelson Dewey - Lancaster as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 27, 2023.

Queue IDS1023
Project nameSurplus; J1000
Status (as published)Active
SubstationNelson Dewey - Lancaster
Point of interconnectionNelson Dewey - Lancaster 138kV
CountyGrant
StateWI
Voltage138 kV
Capacity25 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2023-03-27
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grant, WI: 18 requests in the MISO queue, 8 active totaling 950 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
Project typeGeneration
Queue date2022-05-16
Components (hybrid)Other 25 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first