Substation Scout

MISO request J1374

MISO queue ID J1374

Queue request J1374 was listed in the MISO interconnection queue at the end of 2025 as a 95 MW wind project in Grant County, WI, according to Berkeley Lab’s queue data file. The filing names ATC Ebenezer Sub on Lancaster-Eden line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 8, 2024.

Queue IDJ1374
Project nameNot reported
Status (as published)Active
SubstationATC Ebenezer Sub on Lancaster-Eden line
Point of interconnectionATC Ebenezer Sub on Lancaster-Eden 138kv line
CountyGrant
StateWI
Voltage138 kV
Capacity95 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2024-08-08
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grant, WI: 18 requests in the MISO queue, 8 active totaling 950 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAmerican Transmission Co.
ClusterDPP-2019 East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Not Started
Queue date2019-04-29
Interconnection agreement date2022-09-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first