8 active projects totaling 3,339.2 MW in the MISO queue, plus 14 with terminal status (shown grayed).

8active projects
3,339.2active MW
22total filed
Queue IDProjectkVMWResourceStatus
PQ0002 Not reported 345 2,000 Other Withdrawn
J4113 Not reported n/r 1,315 Gas Active
E0049 Not reported n/r 798.2 Gas Active
G186 Not reported n/r 600 Gas Operational
G174 Not reported n/r 550 Gas Withdrawn
G156 Not reported n/r 500 Other Withdrawn
J3998 Not reported 345 450 Solar Withdrawn
J095 Not reported 161 300 Wind Withdrawn
J1864 Not reported 161 250 Wind Withdrawn
J2553 Not reported n/r 210 Solar Active
J2811 Not reported n/r 210 Solar Active
J3206 Not reported 345 194 Wind Withdrawn
J1952 Not reported 161 180 Wind Withdrawn
J3250 Not reported 161 150 Wind Withdrawn
J447 Not reported 161 150 Wind Withdrawn
J1176 Not reported 161 145 Wind Withdrawn
J2810 Not reported n/r 100 Battery Withdrawn
J3158 Not reported 345 100 Battery Active
J4145 Not reported n/r 98 Gas Active
J1343 Not reported 161 96 Solar Withdrawn
G310 Not reported n/r 8 Wind Operational
J772 Not reported n/r 7.4 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first