MISO queue ID G186

Queue request G186 was listed in the MISO interconnection queue at the end of 2025 as a 600 MW gas project in Cerro Gordo County, IA, according to Berkeley Lab’s queue data file. The filing names Emery Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2007.

Queue IDG186
Project nameNot reported
Status (as published)Operational
SubstationEmery Substation
Point of interconnectionEmery Substation
CountyCerro Gordo
StateIA
VoltageNot reported
Capacity600 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2007-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Emery Substation substation: 2 requests in the MISO queue, 1 active totaling 600 MW.

Queue IDProjectMWResourceStatus
J447Not reported150WindWithdrawn

Cerro Gordo, IA: 22 requests in the MISO queue, 8 active totaling 3,339.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2002-03-16
Interconnection agreement date2003-05-23
Operational date2007-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.