Benton, MN interconnection queue
11 active projects totaling 2,018.6 MW in the MISO queue, plus 3 with terminal status (shown grayed).
11active projects
2,018.6active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G897 | Not reported | 345 | 1,500 | Wind | Withdrawn |
| G898 | Not reported | 345 | 1,500 | Wind | Withdrawn |
| E0022 | Benton Energy Storage II | 115 | 310 | Battery | Active |
| J4132 | Not reported | 230 | 303.8 | Solar | Active |
| J3884 | Not reported | 345 | 300 | Solar | Active |
| J3235 | Not reported | n/r | 250 | Battery | Active |
| J3275 | Not reported | 230 | 249 | Wind | Active |
| E0020 | Benton Solar II | 115 | 105.8 | Solar | Active |
| J1426 | Not reported | 115 | 100 | Solar | Active |
| J1445 | Not reported | 115 | 100 | Solar | Active |
| J2495 | Not reported | 115 | 100 | Solar | Active |
| R1038 | replacing 100MW of un-built solar with BESS; Mayhew | 115 | 100 | Hybrid | Active |
| S1088 | Surplus; J1426 | 115 | 100 | Battery | Active |
| J1140 | Not reported | 115 | 80 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.