Substation Scout

Benton, MN interconnection queue

11 active projects totaling 2,018.6 MW in the MISO queue, plus 3 with terminal status (shown grayed).

11active projects
2,018.6active MW
14total filed
Queue IDProjectkVMWResourceStatus
G897 Not reported 345 1,500 Wind Withdrawn
G898 Not reported 345 1,500 Wind Withdrawn
E0022 Benton Energy Storage II 115 310 Battery Active
J4132 Not reported 230 303.8 Solar Active
J3884 Not reported 345 300 Solar Active
J3235 Not reported n/r 250 Battery Active
J3275 Not reported 230 249 Wind Active
E0020 Benton Solar II 115 105.8 Solar Active
J1426 Not reported 115 100 Solar Active
J1445 Not reported 115 100 Solar Active
J2495 Not reported 115 100 Solar Active
R1038 replacing 100MW of un-built solar with BESS; Mayhew 115 100 Hybrid Active
S1088 Surplus; J1426 115 100 Battery Active
J1140 Not reported 115 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.