Benton Energy Storage II
MISO queue ID E0022
Benton Energy Storage II (E0022) was listed in the MISO interconnection queue at the end of 2025 as a 310 MW battery project in Benton County, MN, according to Berkeley Lab’s queue data file. The filing names Benton County Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 25, 2028.
| Queue ID | E0022 |
|---|---|
| Project name | Benton Energy Storage II |
| Status (as published) | Active |
| Substation | Benton County Substation |
| Point of interconnection | Benton County 115kV Substation |
| County | Benton |
| State | MN |
| Voltage | 115 kV |
| Capacity | 310 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2028-02-25 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Benton County Substation substation: 4 requests in the MISO queue, 3 active totaling 515.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| E0020 | Benton Solar II | 105.8 | Solar | Active |
| J1426 | Not reported | 100 | Solar | Active |
| G897 | Not reported | 1,500 | Wind | Withdrawn |
Benton, MN: 14 requests in the MISO queue, 11 active totaling 2,018.6 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Xcel Energy |
|---|---|
| Developer | Xcel Energy |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Request Status: Active; Post GIA Status: Not started |
| Queue date | 2025-08-06 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.