Substation Scout

replacing 100MW of un-built solar with BESS; Mayhew

MISO queue ID R1038

replacing 100MW of un-built solar with BESS; Mayhew (R1038) was listed in the MISO interconnection queue at the end of 2025 as a 100 MW hybrid project in Benton County, MN, according to Berkeley Lab’s queue data file. The filing names Mayhew Lake as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 1, 2025.

Queue IDR1038
Project namereplacing 100MW of un-built solar with BESS; Mayhew
Status (as published)Active
SubstationMayhew Lake
Point of interconnectionMayhew Lake 115kV
CountyBenton
StateMN
Voltage115 kV
Capacity100 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Benton, MN: 14 requests in the MISO queue, 11 active totaling 2,018.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN STATES POWER COMPANY
Interconnection serviceNRIS
Project typeGeneration
Queue date2023-11-28
Components (hybrid)Other 100 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.