MISO request J4132
MISO queue ID J4132
Queue request J4132 was listed in the MISO interconnection queue at the end of 2025 as a 303.8 MW solar project in Benton County, MN, according to Berkeley Lab’s queue data file. The filing names Mud Lake - Benton County (GRE) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 31, 2030.
| Queue ID | J4132 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Mud Lake - Benton County (GRE) |
| Point of interconnection | Mud Lake - Benton County (GRE) 230kV |
| County | Benton |
| State | MN |
| Voltage | 230 kV |
| Capacity | 303.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2030-01-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Mud Lake - Benton County (GRE) substation: 2 requests in the MISO queue, 2 active totaling 552.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J3275 | Not reported | 249 | Wind | Active |
Benton, MN: 14 requests in the MISO queue, 11 active totaling 2,018.6 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MINNESOTA POWER INC. |
|---|---|
| Cluster | DPP Cycle Pending West |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-10-03 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.