Substation Scout

Benton Solar II

MISO queue ID E0020

Benton Solar II (E0020) was listed in the MISO interconnection queue at the end of 2025 as a 105.8 MW solar project in Benton County, MN, according to Berkeley Lab’s queue data file. The filing names Benton County Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 25, 2028.

Queue IDE0020
Project nameBenton Solar II
Status (as published)Active
SubstationBenton County Substation
Point of interconnectionBenton County 115kV Substation
CountyBenton
StateMN
Voltage115 kV
Capacity105.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-02-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Benton County Substation substation: 4 requests in the MISO queue, 3 active totaling 515.8 MW.

Queue IDProjectMWResourceStatus
E0022Benton Energy Storage II310BatteryActive
J1426Not reported100SolarActive
G897Not reported1,500WindWithdrawn

Benton, MN: 14 requests in the MISO queue, 11 active totaling 2,018.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityXcel Energy
DeveloperXcel Energy
ClusterERAS Study Cycle 2
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.