Sources: BPA · Georgia Power · All sources
Bonneville Power Administration
Requests to connect large loads to BPA's transmission system in the Pacific Northwest, from the interconnection queue BPA publishes.
What this is
BPA is the federal transmission provider for the Pacific Northwest and is not an RTO. Its published interconnection queue contains two distinct request types, and this page reads only the second one: requests to interconnect load to the Federal Columbia River Transmission System. The generation half of the same file feeds the Queue Wire.
BPA was first for a practical reason: it publishes both halves in one machine-readable spreadsheet, refreshed continuously, with a point of interconnection named on almost every row. Most transmission providers publish neither half in a form a program can read.
What this does not cover
A large load served by a local utility rather than by BPA directly may not appear here at all. Puget Sound Energy, Portland General Electric, PacifiCorp and Avista each run their own interconnection processes, and their queues are published as periodic PDFs or not at all.
So the absence of a request in an area is not evidence that no large load is proposed there. It frequently means nobody published it.
What the data does not say
BPA publishes no end-use field. There is no column that says "data center", "fab" or "greenhouse" — a row tells you how many megawatts are requested at which substation, and what stage the request has reached.
What BPA does publish is a project name, on every load request. Some of those names are self-describing — "West Hillsboro Data Center Project (Phase 1)", "NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2)", "Thompson Creek Mine Load" — and some are not: "Open Range", "SSP-Sunset", "Energizer II". Roughly one live request in ten carries a recognizable end-use hint in its name. The rest could be anything.
So the honest position is that end use is sometimes legible from the name and never certified by the data. This site reproduces the name as filed and does not classify it. If you total up the megawatts here and call the result "data center demand", that is your inference, not a figure BPA published.
Requested megawatts are as filed by the requester, not a study result — a filed number is an ask, not an entitlement. Points of interconnection are BPA's own free text and sometimes name a transmission line rather than a substation.
Live load requests
The 50 largest live requests by megawatts as filed. Withdrawn, terminated and decommissioned requests are on record but excluded here. A filed megawatt figure is what the requester asked for, not a study result and not an entitlement.
| MW as filed | Project name as filed | Location | Point of interconnection | Status | Request |
|---|---|---|---|---|---|
| 3,300 | Open Range | Adams County | Lower Monumental-Hanford No 1 Lower Monumental-Ashe No 1 Grand Coulee-Hanford No 1 | RECEIVED | L0705 |
| 2,750 | DOE Data Center | Benton County, WA | Ashe Substation | STUDY | L0673 |
| 2,225 | Longhorn-McNary 230 kV Loop | Morrow County, OR | Longhorn Substation, McNary Substation | STUDY | L0653 |
| 1,800 | NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2) | Washington County, OR | Allston-Keeler No. 1 | STUDY | L0561 |
| 1,500 | Lake Placid Phase 3 | Adams County | Lower Monumental-Hanford No 1 line, Lower Monumental-Ashe No 1 line | RECEIVED | L0712 |
| 1,450 | McNary 230 kV Substation | Umatilla County, OR | McNary Substation | STUDY | L0585 |
| 1,400 | West Hillsboro Data Center Project (Phase 1) | Washington County, OR | Keeler-Forest Grove No. 1 & No. 2 Lines | STUDY | L0560 |
| 1,260 | Lakeside Industries | Klickitat County, WA | Big Eddy Substation | RECEIVED | L0690 |
| 1,256 | McNary 230 kV Looped | Umatilla County | McNary Substation | STUDY | L0636 |
| 1,200 | 1200 MW Data Center Loads | Walla Walla County | Between #37/1 & 32/1 on the Lower Monumental-McNary line | STUDY | L0649 |
| 1,200 | Second 1200 MW Data Center Load | Walla Walla County | Lower Monumental-McNary No. 1 line | RECEIVED | L0682 |
| 1,200 | SSP-Sunset | Yakima County | Wautoma-Rock Creek No. 1 line or Spring Creek-Wine Country No. 1 line | STUDY | L0684 |
| 1,000 | Keeler Substation | Washington County, OR | BPA's Keeler Substation | CONST AGRMT EXE | L0452 |
| 1,000 | Six Mile Canyon Substation | Umatilla County, OR | BPA's Ashe - Slatt No.1 line | CONST AGRMT EXE | L0510 |
| 1,000 | Dallesport Server Farm | Klickitat County, WA | Big Eddy Substation or Big Eddy-Chenowith No. 2 line | STUDY | L0664 |
| 1,000 | Two Rivers 230 kV | Umatilla County | McNary Substation | STUDY | L0660 |
| 1,000 | Energizer II | Klickitat County | Rock Creek Substation at | RECEIVED | L0702 |
| 1,000 | Vines Rest 1000 MW | Klickitat County | McNary-John Day No. 1 line McNary-John Day No. 2 line | RECEIVED | L0704 |
| 970 | Yellow Rosebush | Wasco County | Buckley Substation or Buckley-Marion No. 1 line or Ashe-Marion No. 2 line. | STUDY | L0699 |
| 958 | Stack IPI Data Center | Klickitat County, WA | RKCR-JDAY-1 or MCNY-ROSS-2 near Harvalum Substation | STUDY | L0545 |
| 950 | Plymouth 950 MW | Benton County, WA | McNary-John Day No. 2 line or McNary-Ross No. 1 line or McNary-Horse Heaven No. 1 | RECEIVED | L0703 |
| 912 | West Richland Data Center Campus | Benton County, WA | Ashe-Slatt No 1 line; Ashe-Marion No 2 line | STUDY | L0621 |
| 800 | Wind River - Plymouth 230 kV | Benton County | McNary-John Day No. 2 line | STUDY | L0685 |
| 750 | Longhorn 230 kV Substation | Morrow County, OR | Longhorn Substation | STUDY | L0586 |
| 700 | Woodburn 700 MW | Marion County | Big Eddy-Chemawa No 1 line | STUDY | L0659 |
| 600 | Steelhead 230 kV | Morrow County, OR | Sixmile Canyon Substation at | STUDY | L0661 |
| 550 | Juan de Fuca HVDC (Port Angeles) | Clallam County, WA | Port Angeles | STUDY COMPLETED | L0201 |
| 550 | Juan de Fuca HVDC (Fairmount) | Jefferson County, WA | Fairmount | STUDY COMPLETED | L0202 |
| 500 | Morrow Flat_Longhorn | Umatilla County, OR | Morrow Flat Substation | ENERGIZED | L0482 |
| 500 | Starbuck 500 MW | Columbia County, WA | Central Ferry-Lower Monumental No. 1 line | STUDY | L0674 |
| 484 | Project Pivot and Specialized | Umatilla County, OR | McNary Substation | STUDY | L0499 |
| 450 | Industrial Load | Morrow County, OR | Mcnary Substation or Morrow Flat Substation | ENERGIZED | L0389 |
| 450 | McNary 230kV | Umatilla County, OR | McNary , Bay 28 | CONST AGRMT EXE | L0481 |
| 370 | Boundary Substation | Pend Oreille County, WA | Boundary Substation | STUDY | L0417 |
| 350 | Atlas Agro | Benton County, WA | Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line | STUDY | L0534 |
| 300 | Network Load Expansion 3 | Wasco County, OR | Chenoweth Substation | ENERGIZED | L0380 |
| 300 | Network Load Expansion 4 Quenett Creek Substation | Wasco County, OR | Quenett Creek Substation | ENERGIZED | L0433 |
| 300 | Bonanza | Crook County, OR | Ponderosa Substation | STUDY | L0543 |
| 300 | Stearns Lane | Douglas County, OR | BPA's Green Valley Substation | STUDY | L0558 |
| 300 | Ponderary Renewable Fiber and Blockchain Project | Pend Oreille County, WA | Usk Substation | ENERGIZED | L0494 |
| 300 | Getchell Substation | Snohomish County, WA | Snohomish-Murray line | STUDY | L0603 |
| 300 | Data Storage Facility | Walla Walla County, WA | Lower Monumental-McNary No. 1 line | STUDY | L0630 |
| 300 | Atlas Agro Data Server Facility | Benton County, WA | Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line | STUDY | L0647 |
| 300 | Atlas Agro Data Server Facility, Phase 2 | Benton County, WA | Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line | STUDY | L0657 |
| 300 | 300 MW Data Center Load Served from Grizzly | Jefferson County | Grizzly Substation | STUDY | L0650 |
| 300 | PARS - MW&L | Yamhill County | TBD | STUDY | L0700 |
| 300 | Clenera 300 MW | Klickitat County | Energizer Substation or Rock Creek Substation | RECEIVED | L0709 |
| 277 | Energizer 277 MW Alternative Interconnection | Klickitat County | Big Eddy-Spring Creek No. 1 line | RECEIVED | L0715 |
| 250 | PW1 & PW2 PARS | Columbia County, WA | Allston Substation | STUDY | L0610 |
| 250 | ATP TES Data Server | Benton County | Benton Substation | RECEIVED | L0668 |
What changed
47 tracked changes since September 23, 2026, excluding the 138 baseline rows. A request restating its megawatts upward without changing status is the strongest signal in this data, and it is invisible in a status-only view — so restatements are tracked separately.
| Change | MW | Project name as filed | Location | Status | Request |
|---|---|---|---|---|---|
| New request | +277 | Energizer 277 MW Alternative Interconnection | Klickitat County | RECEIVED | L0715 |
| Status change | — | WPUD Sub 4 | Whatcom County | RECEIVED → BPA COMPLETED | L0713 |
| Status change | — | Boardman-Ione No. 1 69 kV Line Removal Project | Umatilla County, OR | E&P EXECUTED → CONST AGRMT EXE | L0516 |
| Status change | — | Atlas Agro | Benton County, WA | STUDY COMPLETED → STUDY | L0534 |
| Restated upward | +500 | Lake Placid Phase 3 | Adams County | RECEIVED → RECEIVED | L0712 |
| Withdrawn | -400 | Lake Placid Phase 2 | Adams County | RECEIVED → WITHDRAWN | L0711 |
| Withdrawn | -100 | Lake Placid Phase 1 | Adams County | RECEIVED → WITHDRAWN | L0710 |
| Status change | — | Huard Road | Benton County, WA | CONST AGRMT EXE → ENERGIZED | L0467 |
| Withdrawn | -7 | Bellevue Substation | Franklin County, WA | STUDY COMPLETED → WITHDRAWN | L0528 |
| Status change | — | New 115 kV Creston Substation | Spokane County, WA | STUDY → STUDY COMPLETED | L0619 |
| Status change | — | Diesel Refinery Additional Load PARS | Columbia County, WA | STUDY → STUDY COMPLETED | L0591 |
| Status change | — | Cascade Renewable Transmission Project - HVDC | Wasco County, OR | STUDY → STUDY COMPLETED | L0491 |
| Status change | — | Mapleton | Lane County, OR | STUDY COMPLETED → BPA COMPLETED | L0590 |
| Status change | — | New Midway Substation | Teton County, ID | STUDY → STUDY COMPLETED | L0581 |
| Status change | — | Boardman to Hemingway Project | Umatilla County, OR | STUDY COMPLETED → CONST AGRMT EXE | L0515 |
| Withdrawn | — | Swift-Troutdale Line | Clark County, WA | STUDY COMPLETED → WITHDRAWN | L0502 |
| Status change | — | Lakeview System Transfer | Lake County, OR | RECEIVED → BPA COMPLETED | L0706 |
| Status change | — | PARS - MW&L | Yamhill County | RECEIVED → STUDY | L0700 |
| Status change | — | PARS - St. Helens Substation (POD 3043) | Columbia County | RECEIVED → STUDY | L0697 |
| Status change | — | PARS - Betsy Johnson Substation (POD 4514) | Columbia County | RECEIVED → STUDY | L0698 |
| Status change | — | PARS – Forest Grove Substation | Washington County | RECEIVED → STUDY | L0694 |
| Status change | — | PARS – Filbert Substation | Washington County | RECEIVED → STUDY | L0695 |
| Status change | — | PARS – Thatcher Substation | Washington County | RECEIVED → STUDY | L0696 |
| Status change | — | Jorstad Substation | Mason County | STUDY → STUDY COMPLETED | L0681 |
| New request | +1,000 | Lake Placid Phase 3 | Adams County | RECEIVED | L0712 |
| New request | +400 | Lake Placid Phase 2 | Adams County | RECEIVED | L0711 |
| New request | +100 | Lake Placid Phase 1 | Adams County | RECEIVED | L0710 |
| Status change | — | BBEC - Camp Sub | Franklin County, WA | STUDY → STUDY COMPLETED | L0509 |
| Status change | — | L0503 Toledo-Wendson 230 kV | Lincoln County, OR | STUDY → STUDY COMPLETED | L0503 |
| Status change | — | Lyons Loop | Marion County, OR | STUDY → BPA COMPLETED | L0475 |
| Status change | — | Duckabush | Mason County, WA | STUDY → BPA COMPLETED | L0464 |
| Status change | — | T3ba'das Substation | Mason County, WA | STUDY → BPA COMPLETED | L0466 |
| Status change | — | Alderwood Tap Line | Lane County, OR | STUDY → STUDY COMPLETED | L0461 |
| Status change | — | Briones | Crook County, OR | STUDY → STUDY COMPLETED | L0448 |
| Status change | — | Salzer Valley Substation | Lewis County, WA | STUDY → ENERGIZED | L0394 |
| Status change | — | Finley Butte Substation | Deschutes County, OR | STUDY → STUDY COMPLETED | L0393 |
| Status change | — | Grandview Substation | Yakima County, WA | STUDY COMPLETED → BPA COMPLETED | L0376 |
| Withdrawn | -680 | PARS - Clatskanie | Columbia County | RECEIVED → WITHDRAWN | L0701 |
| New request | +300 | Clenera 300 MW | Klickitat County | RECEIVED | L0709 |
| Withdrawn | -3 | SDC | Cowlitz County | BPA COMPLETED → WITHDRAWN | L0646 |
A request moving to a terminal status means the request was withdrawn from the study queue. It is not evidence that power is obtainable at that location — that turns on study results and upgrade obligations this data does not report.
Source
BPA interconnection queue — LINE/LOAD (large load) requests — published spreadsheet. Ingested November 23, 2026.
- Covers the BPA queue only. BPA is the federal transmission provider for the Pacific Northwest and is not an RTO; this file covers requests to interconnect load to the Federal Columbia River Transmission System.
- A large load served by a local utility (Puget Sound Energy, Portland General, PacifiCorp, Avista) rather than by BPA directly may not appear here.
- Absence of a request is not evidence that no large load is proposed in an area.
- BPA does not publish an end-use field: a load request is not labelled as a data center, factory, or electrolyser. Any such attribution would be inference, not data.
- Point-of-interconnection strings are BPA free text and sometimes name a transmission line rather than a substation.
- 62 of 464 requests carry no state in the source file. State is left null rather than inferred from county, because counties such as Benton, Columbia, Grant, Douglas and Lincoln exist in both Washington and Oregon.
More
Large Load Registry, all sources → · Queue Wire — generation queue deltas → · Roadmap →