TNP One Plant substation interconnection queue

2 active projects totalling 755.7 MW in the ERCOT queue.

2active projects
755.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0017 Big Rooter East Solar 345 554.7 Solar SS Completed, FIS Started, IA
29INR0018 Big Rooter East Storage 345 201 Battery SS Completed, FIS Started, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.