TNP One Plant substation interconnection queue

2 active projects totalling 755.7 MW in the ERCOT queue.

2active projects
755.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0017 Big Rooter East Solar 345 554.7 Solar SS Completed, FIS Started, IA
29INR0018 Big Rooter East Storage 345 201 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.