Tap TNP ONE PLANT - TWIN OAK Ckt 2 substation interconnection queue
8 active projects totalling 816.8 MW in the ERCOT queue.
8active projects
816.8active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 27INR0418 | Pioneer Path Energy Storage 1 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
| 27INR0423 | Pioneer Path Energy Storage 2 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
| 27INR0424 | Pioneer Path Energy Storage 3 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
| 27INR0425 | Pioneer Path Energy Storage 4 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
| 27INR0426 | Prairie Horizon Energy Storage 1 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
| 27INR0427 | Prairie Horizon Energy Storage 2 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
| 27INR0428 | Prairie Horizon Energy Storage 3 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
| 27INR0429 | Prairie Horizon Energy Storage 4 | 345 | 102.1 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.