Tap to Jim English (#) – Flat Branch (#) substation interconnection queue

4 active projects totalling 1,070.2 MW in the ERCOT queue.

4active projects
1,070.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
24INR0420 Camino Ranch Storage SLF 138 298.1 Battery SS Completed, FIS Completed, IA
24INR0412 Camino Ranch Solar SLF 138 296.4 Solar SS Completed, FIS Completed, IA
26INR0257 Camino Ranch Storage 2 SLF 138 238.5 Battery SS Completed, FIS Completed, IA
26INR0256 Camino Ranch Solar 2 SLF 138 237.2 Solar SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.