Tap # Krum West - # Riley Ckt 1 substation interconnection queue
2 active projects totalling 611.4 MW in the ERCOT queue.
2active projects
611.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 28INR0423 | Prairie Branch BESS | 345 | 310.2 | Battery | SS Completed, FIS Started, No IA |
| 28INR0422 | Prairie Branch Solar | 345 | 301.2 | Solar | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.