Montague, TX interconnection queue
4 active projects totalling 1,014.1 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).
4active projects
1,014.1active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 28INR0423 | Prairie Branch BESS | 345 | 310.2 | Battery | SS Completed, FIS Started, No IA |
| 28INR0422 | Prairie Branch Solar | 345 | 301.2 | Solar | SS Completed, FIS Started, No IA |
| 25INR0190 | Fortissimo BESS | 138 | 202.7 | Battery | SS Completed, FIS Completed, No IA |
| 30INR0140 | Enfinity Primrose | 138 | 200 | Battery | SS Started, FIS Started, No IA |
| 26INR0138 | Weathervane Solar SLF | n/r | 160.5 | Solar | Cancelled |
| 26INR0139 | Weathervane Storage SLF | n/r | 32.5 | Battery | Cancelled |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.