tap Graham - Tonkawas substation interconnection queue

2 active projects totalling 643.4 MW in the ERCOT queue.

2active projects
643.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0309 Solace Storage 345 321.8 Battery SS Completed, FIS Completed, IA
23INR0031 Solace Solar 345 321.6 Solar SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.