Tap Aspermont – Paint Creek substation interconnection queue

2 active projects totalling 125.5 MW in the ERCOT queue.

2active projects
125.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0146 DMF Sagerton Solar SLF 138 125.5 Solar SS Completed, FIS Started, No IA
26INR0148 DMF Sagerton Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.