Tap # Edna - # El Toro SW substation interconnection queue

2 active projects totalling 244.7 MW in the ERCOT queue.

2active projects
244.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0251 Sayle Solar SLF 69 122.4 Solar SS Completed, FIS Started, No IA
27INR0260 Sayle Storage SLF 69 122.3 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.