Jackson, TX interconnection queue

6 active projects totalling 829.5 MW in the ERCOT queue.

6active projects
829.5active MW
6total filed
Queue IDProjectkVMWResourceStatus
20INR0236 New Hickory Solar 345 209.2 Solar SS Completed, FIS Completed, IA
25INR0441 Dios BESS 138 201.1 Battery SS Completed, FIS Completed, IA
27INR0251 Sayle Solar SLF 69 122.4 Solar SS Completed, FIS Started, No IA
27INR0260 Sayle Storage SLF 69 122.3 Battery SS Completed, FIS Started, No IA
23INR0361 Third Coast BESS 138 102.8 Battery SS Completed, FIS Completed, IA
27INR0554 Texas Sun Solar n/r 71.7 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.