Hoke Solar
ERCOT queue ID 23INR0231
Hoke Solar (23INR0231) is listed in the ERCOT interconnection queue as a 95.3 MW solar project in Gonzales County, TX. The filing names tap Deer Creek - Nixon as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 5, 2027. It records the screening study as complete on July 14, 2021, the full interconnection study as approved on July 17, 2026 and the interconnection agreement as signed on April 25, 2022.
| Queue ID | 23INR0231 |
|---|---|
| Project name | Hoke Solar |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | tap Deer Creek - Nixon |
| Point of interconnection | tap 138kV 7595 Deer Creek - 7621 Nixon |
| County | Gonzales |
| State | TX |
| Voltage | 138 kV |
| Capacity | 95.3 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-07-05 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
tap Deer Creek - Nixon substation: 2 requests in the ERCOT queue, 2 active totaling 128.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 23INR0232 | Hoke Storage | 33.2 | Battery | SS Completed, FIS Completed, IA |
Gonzales, TX: 8 requests in the ERCOT queue, 7 active totaling 1,171.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Hoke Solar Project, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2022-04-25 |
| Screening study complete | 2021-07-14 |
| Full interconnection study approved | 2026-07-17 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.