Substation Scout

Tap COTTONWOOD - EDITH CLARKE substation interconnection queue

2 active projects totalling 404.4 MW in the ERCOT queue.

2active projects
404.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0267 Soluce Cotton Solar 345 202.9 Solar SS Completed, FIS Started, No IA
28INR0268 Soluce Cotton Storage 345 201.5 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.