Edith Clark (#) substation interconnection queue

2 active projects totalling 501.9 MW in the ERCOT queue.

2active projects
501.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
25INR0177 Triangle Ranch Alpha 345 301.7 Wind SS Completed, FIS Started, No IA
25INR0178 Triangle Ranch Bravo 345 200.2 Wind SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.