Cottle, TX interconnection queue
4 active projects totalling 906.3 MW in the ERCOT queue, plus 4 with terminal status (shown greyed).
4active projects
906.3active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 25INR0177 | Triangle Ranch Alpha | 345 | 301.7 | Wind | SS Completed, FIS Started, No IA |
| 28INR0267 | Soluce Cotton Solar | 345 | 202.9 | Solar | SS Completed, FIS Started, No IA |
| 28INR0268 | Soluce Cotton Storage | 345 | 201.5 | Battery | SS Completed, FIS Started, No IA |
| 25INR0178 | Triangle Ranch Bravo | 345 | 200.2 | Wind | SS Completed, FIS Started, No IA |
| 25INR0179 | Triangle Ranch Charlie | n/r | 200.2 | Wind | Inactive |
| 25INR0180 | Triangle Ranch Delta | n/r | 101.5 | Wind | Inactive |
| 25INR0181 | Triangle Ranch Echo | n/r | 100.5 | Wind | Inactive |
| 25INR0182 | Triangle Ranch Fox | n/r | 100.5 | Wind | Inactive |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.