Tap Blackburn Switch – Palestine substation interconnection queue
2 active projects totaling 201 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Blackburn Switch – Palestine as the point of interconnection, all in Anderson County, TX.
Target commercial operation date as filed: Sep 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Neches Solar, LLC (2 filings).
2active projects
201active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 23INR0439 | Lumen Farm Solar SLF | 138 | 201 | Solar | SS Completed, FIS Started, No IA | Sep 2028 |
| 24INR0450 | Lumen Farm BESS SLF | 138 | 0 | Battery | SS Completed, FIS Started, No IA | Sep 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Anderson County, TX
- # Pin Oak: 3 active, 3,789 MW of 3 filed
Site Scanner