Tap Blackburn Switch – Palestine substation interconnection queue

2 active projects totaling 201 MW in the ERCOT queue.

2 ERCOT queue filings name Tap Blackburn Switch – Palestine as the point of interconnection, all in Anderson County, TX.

Target commercial operation date as filed: Sep 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Neches Solar, LLC (2 filings).

2active projects
201active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
23INR0439 Lumen Farm Solar SLF 138 201 Solar SS Completed, FIS Started, No IA Sep 2028
24INR0450 Lumen Farm BESS SLF 138 0 Battery SS Completed, FIS Started, No IA Sep 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Anderson County, TX

All 9 ERCOT queue filings in Anderson County, TX.