# Pin Oak substation interconnection queue
3 active projects totaling 3,789 MW in the ERCOT queue.
3 ERCOT queue filings name # Pin Oak as the point of interconnection, all in Anderson County, TX.
Target commercial operation dates as filed run from Jul 2031 to Jul 2032 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Anderson Energy Center, LLC (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 31INR0021 | Mule Deer Run Gas II | 345 | 1,263 | Gas | SS Completed, FIS Started, No IA | Jul 2032 |
| 31INR0022 | Mule Deer Run Gas III | 345 | 1,263 | Gas | SS Completed, FIS Started, No IA | Jul 2032 |
| 32INR0003 | Mule Deer Run Gas | 345 | 1,263 | Gas | SS Completed, FIS Started, No IA | Jul 2031 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-07 | 31INR0021 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-09-07 | 31INR0022 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Same name on other Substation Scout pages
Other sources that print a substation named “# Pin Oak” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Pin Oak: Expansion Tracker, ERCOT planning (Freestone County, TX)
Other ERCOT queue substations in Anderson County, TX
- Tap Blackburn Switch – Palestine: 2 active, 201 MW of 2 filed