Tap Bearkat - L_NORTMC5_1Y substation interconnection queue

2 active projects totaling 419.1 MW in the ERCOT queue.

2 ERCOT queue filings name Tap Bearkat - L_NORTMC5_1Y as the point of interconnection, all in Upton County, TX.

Target commercial operation date as filed: May 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Greasewood Solar, LLC (2 filings).

2active projects
419.1active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
28INR0212 Badger Solar 345 280.5 Solar SS Completed, FIS Started, No IA May 2029
28INR0213 Badger BESS 345 138.6 Battery SS Completed, FIS Started, No IA May 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-0528INR0212Capacity revised−21.4 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA
2026-10-0528INR0213Capacity revised−15.6 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA

Other ERCOT queue substations in Upton County, TX

All 22 ERCOT queue filings in Upton County, TX.