Tap Bearkat - L_NORTMC5_1Y substation interconnection queue
2 active projects totaling 419.1 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Bearkat - L_NORTMC5_1Y as the point of interconnection, all in Upton County, TX.
Target commercial operation date as filed: May 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Greasewood Solar, LLC (2 filings).
2active projects
419.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0212 | Badger Solar | 345 | 280.5 | Solar | SS Completed, FIS Started, No IA | May 2029 |
| 28INR0213 | Badger BESS | 345 | 138.6 | Battery | SS Completed, FIS Started, No IA | May 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | 28INR0212 | Capacity revised | −21.4 | SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-10-05 | 28INR0213 | Capacity revised | −15.6 | SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA |
Other ERCOT queue substations in Upton County, TX
- Twelvemile: 2 active, 798 MW of 2 filed
- Castillo: 2 active, 190 MW of 2 filed
Site Scanner