Substation Scout

Tap Bayou Loco - Central Angelina County substation interconnection queue

0 active projects totalling 0 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0228 Sunlit Pines BESS SLF 138 208.1 Battery Inactive
27INR0226 Sunlit Pines Solar SLF 138 206.7 Solar Inactive

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.