Nacogdoches, TX interconnection queue
3 active projects totalling 587.9 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).
3active projects
587.9active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 27INR0313 | Spindletop Solar | 345 | 286.4 | Solar | SS Completed, FIS Completed, IA |
| 27INR0228 | Sunlit Pines BESS SLF | 138 | 208.1 | Battery | Inactive |
| 27INR0226 | Sunlit Pines Solar SLF | 138 | 206.7 | Solar | Inactive |
| 26INR0161 | Timberline Solar | 345 | 201 | Solar | SS Completed, FIS Started, No IA |
| 26INR0162 | Timberline Storage | 345 | 100.5 | Battery | SS Completed, FIS Started, No IA |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.