Railhead Substation (RAILHEAD #) substation interconnection queue

2 active projects totalling 811.1 MW in the ERCOT queue.

2active projects
811.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0022 Panhandle Flagship Solar 1 345 439.4 Solar SS Completed, FIS Started, IA
27INR0025 Panhandle Flagship Storage 345 371.7 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.