Railhead Substation (RAILHEAD #) substation interconnection queue

2 active projects totalling 811.1 MW in the ERCOT queue.

2active projects
811.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0022 Panhandle Flagship Solar 1 345 439.4 Solar SS Completed, FIS Started, IA
27INR0025 Panhandle Flagship Storage 345 371.7 Battery SS Completed, FIS Started, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.