Substation Scout

Lyra Solar

ERCOT queue ID 27INR0434

Lyra Solar (27INR0434) is listed in the ERCOT interconnection queue as a 600 MW solar project in Borden County, TX. The filing names MULESHOE (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of October 20, 2028. It records the screening study as complete on June 9, 2025 and the interconnection agreement as signed on July 1, 2025.

Queue ID27INR0434
Project nameLyra Solar
Status (as published)SS Completed, FIS Started, IA
SubstationMULESHOE (#)
Point of interconnection345kV MULESHOE (#59922)
CountyBorden
StateTX
Voltage345 kV
Capacity600 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-10-20
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

MULESHOE (#) substation: 2 requests in the ERCOT queue, 2 active totaling 1,100 MW.

Queue IDProjectMWResourceStatus
26INR0636Lyra Storage500BatterySS Completed, FIS Started, IA

Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Capacity revised +100 SS Completed, FIS Started, IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting entityJuno Solar 4
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-07-01
Screening study complete2025-06-09
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.