Austrop substation interconnection queue

3 active projects totalling 306.3 MW in the ERCOT queue.

3active projects
306.3active MW
3total filed
Queue IDProjectkVMWResourceStatus
27INR0485 Blackland Prairie 1 Energy Storage 138 102.1 Battery SS Completed, FIS Started, IA
27INR0486 Blackland Prairie 2 Energy Storage 138 102.1 Battery SS Completed, FIS Started, No IA
27INR0487 Blackland Prairie 3 Energy Storage 138 102.1 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.