Capshaw Solar
ERCOT queue ID 30INR0158
| Queue ID | 30INR0158 |
|---|---|
| Project name | Capshaw Solar |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | POIB: Tapping Drylake_5 (#) – TNFaulkner3 (#) |
| Point of interconnection | POIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kV |
| County | Reeves |
| State | TX |
| Voltage | 345 kV |
| Capacity | 450 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2030-07-01 |
| Source dataset | large |
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | New request | 450 | Not reported → SS Started, FIS Started, No IA |
Additional filed fields
| Interconnecting Entity | NextEra Energy Resources Interconnection Holding, LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Water Availability | Not Required |