Pentarise BESS
ERCOT queue ID 30INR0100
Pentarise BESS (30INR0100) is listed in the ERCOT interconnection queue as a 150.6 MW battery project in Pecos County, TX. The filing names Pig Creek (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 30, 2030. It records the screening study as complete on September 4, 2026.
| Queue ID | 30INR0100 |
|---|---|
| Project name | Pentarise BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Pig Creek (#) |
| Point of interconnection | 138 kV Pig Creek (#60393) |
| County | Pecos |
| State | TX |
| Voltage | 138 kV |
| Capacity | 150.6 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-06-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Pentarise BESS, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2026-09-04 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.