Springfield Solar
ERCOT queue ID 30INR0058
Springfield Solar (30INR0058) is listed in the ERCOT interconnection queue as a 400 MW solar project in Pecos County, TX. The filing names Tap Leon Creek (#) to Woodhouse Station (#) line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of August 30, 2028. It records the screening study as complete on October 15, 2025 and the interconnection agreement as signed on December 24, 2025.
| Queue ID | 30INR0058 |
|---|---|
| Project name | Springfield Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap Leon Creek (#) to Woodhouse Station (#) line |
| Point of interconnection | Tap Leon Creek (#38355) to Woodhouse Station (#38308) 138kV line |
| County | Pecos |
| State | TX |
| Voltage | 138 kV |
| Capacity | 400 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-08-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BOULEVARD ASSOCIATES, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-12-24 |
| Screening study complete | 2025-10-15 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.