Big Canyon Wind

ERCOT queue ID 30INR0018

Big Canyon Wind (30INR0018) is listed in the ERCOT interconnection queue as a 1,500 MW wind project in Pecos County, TX. The filing names Bottlebrush as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of July 1, 2030. It records the screening study as complete on April 8, 2025 and the interconnection agreement as signed on December 24, 2025.

Queue ID30INR0018
Project nameBig Canyon Wind
Status (as published)SS Completed, FIS Started, IA
SubstationBottlebrush
Point of interconnection38441 Bottlebrush 345kV
CountyPecos
StateTX
Voltage345 kV
Capacity1,500 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2030-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLongfellow Wind, LLC
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Interconnection agreement signed2025-12-24
Screening study complete2025-04-08
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.