Lone Tiger Solar
ERCOT queue ID 29INR0393
| Queue ID | 29INR0393 |
|---|---|
| Project name | Lone Tiger Solar |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | Tap Claytonville (#) to phantom hill (#) |
| Point of interconnection | Tap 345 kV Claytonville (#68001) to phantom hill (#68004) |
| County | Jones |
| State | TX |
| Voltage | 345 kV |
| Capacity | 242.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2029-10-06 |
| Source dataset | large |
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | New request | 242.8 | Not reported → SS Started, FIS Started, No IA |
Additional filed fields
| Interconnecting Entity | Origis Development, LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.