Substation Scout

Spurland Solar II

ERCOT queue ID 29INR0195

Queue ID29INR0195
Project nameSpurland Solar II
Status (as published)SS Completed, FIS Started, IA
SubstationNova Prime 345
Point of interconnection59908 Nova Prime 345 345kV
CountyDickens
StateTX
Voltage345 kV
Capacity201.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-12-30
Source datasetlarge

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting EntitySpurland Solar II
Cdr ZonePANHANDLE
Fuel CodeSOL
Technology CodePV
Ia Signed46240
Screening Study Complete46034
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.