Star Of Texas Solar
ERCOT queue ID 29INR0188
Star Of Texas Solar (29INR0188) is listed in the ERCOT interconnection queue as a 415 MW solar project in Pecos County, TX. The filing names Fort Stockton Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 1, 2029. It records the screening study as complete on November 10, 2025.
| Queue ID | 29INR0188 |
|---|---|
| Project name | Star Of Texas Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Fort Stockton Switch |
| Point of interconnection | 60152 Fort Stockton Switch 345kV |
| County | Pecos |
| State | TX |
| Voltage | 345 kV |
| Capacity | 415 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-07-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BOULEVARD ASSOCIATES, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2025-11-10 |
| Water availability | Not Required |