ERCOT queue ID 29INR0188

Star Of Texas Solar (29INR0188) is listed in the ERCOT interconnection queue as a 415 MW solar project in Pecos County, TX. The filing names Fort Stockton Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 1, 2029. It records the screening study as complete on November 10, 2025.

Queue ID29INR0188
Project nameStar Of Texas Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationFort Stockton Switch
Point of interconnection60152 Fort Stockton Switch 345kV
CountyPecos
StateTX
Voltage345 kV
Capacity415 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBOULEVARD ASSOCIATES, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2025-11-10
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.