Palisade BESS

ERCOT queue ID 29INR0174

Palisade BESS (29INR0174) is listed in the ERCOT interconnection queue as a 153.5 MW battery project in Brazoria County, TX. The filing names Hoffman - Lake Jackson line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 1, 2029. It records the screening study as complete on December 23, 2025.

Queue ID29INR0174
Project namePalisade BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationHoffman - Lake Jackson line
Point of interconnectionHoffman (42810) - Lake Jackson (42880) 138 kV line
CountyBrazoria
StateTX
Voltage138 kV
Capacity153.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFlexen USA LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2025-12-23

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.