Skyrider Wind
ERCOT queue ID 29INR0025
Skyrider Wind (29INR0025) is listed in the ERCOT interconnection queue as a 370 MW wind project in Pecos County, TX. The filing names # TNPINION as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on February 18, 2025 and the interconnection agreement as signed on December 23, 2025.
| Queue ID | 29INR0025 |
|---|---|
| Project name | Skyrider Wind |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | # TNPINION |
| Point of interconnection | 138kV #38365 TNPINION |
| County | Pecos |
| State | TX |
| Voltage | 138 kV |
| Capacity | 370 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2028-07-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | NextEra Energy Interconnection Holdings, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | WIN |
| Technology code | WT |
| Interconnection agreement signed | 2025-12-23 |
| Screening study complete | 2025-02-18 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.