Aurelius 2 Solar

ERCOT queue ID 29INR0009

Aurelius 2 Solar (29INR0009) is listed in the ERCOT interconnection queue as a 445.4 MW solar project in Deaf Smith County, TX. The filing names Deaf Smith station . This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of MW PUN load (refer to the substation SLD). as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of September 30, 2028. It records the screening study as complete on March 1, 2024, the full interconnection study as approved on October 12, 2026 and the interconnection agreement as signed on July 10, 2026.

Queue ID29INR0009
Project nameAurelius 2 Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationDeaf Smith station . This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of MW PUN load (refer to the substation SLD).
Point of interconnection23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).
CountyDeaf Smith
StateTX
Voltage345 kV
Capacity445.4 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-09-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Deaf Smith, TX: 11 requests in the ERCOT queue, 11 active totaling 6,391.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityIP Roman, LLC
CDR reporting zonePANHANDLE
Fuel codeSOL
Technology codePV
Interconnection agreement signed2026-07-10
Screening study complete2024-03-01
Full interconnection study approved2026-10-12
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first