TempleCloud Gas
ERCOT queue ID 28INR0508
TempleCloud Gas (28INR0508) is listed in the ERCOT interconnection queue as a 1,139.7 MW gas project in Bell County, TX. The filing names Tap # Temple Switch - # Tower Switch DCKT Line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 19, 2029. It records the screening study as complete on October 21, 2026.
| Queue ID | 28INR0508 |
|---|---|
| Project name | TempleCloud Gas |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap # Temple Switch - # Tower Switch DCKT Line |
| Point of interconnection | Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line |
| County | Bell |
| State | TX |
| Voltage | 345 kV |
| Capacity | 1,139.7 MW |
| Resource (as published) | GAS/IC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-10-19 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap # Temple Switch - # Tower Switch DCKT Line substation: 2 requests in the ERCOT queue, 2 active totaling 1,776.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0206 | Riviera Gas | 636.9 | Gas | SS Completed, FIS Started, No IA |
Bell, TX: 14 requests in the ERCOT queue, 14 active totaling 4,237.3 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | New request | 1,139.7 | Not reported → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Kalnin Ventures, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | GAS |
| Technology code | IC |
| Screening study complete | 2026-10-21 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.