Alpha Digital Campus Combined-cycle and Co-located Load
ERCOT queue ID 28INR0499
Alpha Digital Campus Combined-cycle and Co-located Load (28INR0499) is listed in the ERCOT interconnection queue as a 58.3 MW gas project in Reeves County, TX. The filing names TNCOWPEN__3 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2027. It records the screening study as complete on July 9, 2026.
| Queue ID | 28INR0499 |
|---|---|
| Project name | Alpha Digital Campus Combined-cycle and Co-located Load |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | TNCOWPEN__3 |
| Point of interconnection | 38044 TNCOWPEN__3 345kV |
| County | Reeves |
| State | TX |
| Voltage | 345 kV |
| Capacity | 58.3 MW |
| Resource (as published) | GAS/CC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | PowerBridge LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | GAS |
| Technology code | CC |
| Screening study complete | 2026-07-09 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.