Seven Angels Energy Storage II
ERCOT queue ID 28INR0473
Seven Angels Energy Storage II (28INR0473) is listed in the ERCOT interconnection queue as a 524.4 MW battery project in Hill County, TX. The filing names Sam Switch Bus as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on January 12, 2026.
| Queue ID | 28INR0473 |
|---|---|
| Project name | Seven Angels Energy Storage II |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Sam Switch Bus |
| Point of interconnection | 68090 Sam Switch Bus 345kV |
| County | Hill |
| State | TX |
| Voltage | 345 kV |
| Capacity | 524.4 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Sam Switch Bus substation: 2 requests in the ERCOT queue, 2 active totaling 1,048.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 28INR0472 | Seven Angels Energy Storage I | 524.4 | Battery | SS Completed, FIS Started, No IA |
Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | +10.4 | SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Seven Angels Infrastructure LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2026-01-12 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.