Barranca Wind 1
ERCOT queue ID 28INR0375
| Queue ID | 28INR0375 |
|---|---|
| Project name | Barranca Wind 1 |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap the CENIZO (#) - DELSOL (#) line |
| Point of interconnection | Tap the 345 kV CENIZO (#80225) - DELSOL (#80307) line |
| County | Jim Hogg |
| State | TX |
| Voltage | 345 kV |
| Capacity | 300.9 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalised for filtering) |
| Target commercial operation | 2028-06-01 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Barranca Wind Energy, LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | WIN |
| Technology Code | WT |
| Screening Study Complete | 45936 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.