Jim Hogg, TX interconnection queue

9 active projects totalling 2,933.3 MW in the ERCOT queue.

9active projects
2,933.3active MW
9total filed
Queue IDProjectkVMWResourceStatus
29INR0154 Las Mujeres Solar n/r 684.3 Solar SS Started, FIS Started, No IA
28INR0072 Mirando Valley Wind 345 478.7 Wind SS Completed, FIS Started, IA
28INR0434 Viento Bravo Wind 345 366.5 Wind SS Completed, FIS Started, IA
28INR0242 Ciervo Wind 345 301.5 Wind SS Completed, FIS Started, No IA
28INR0375 Barranca Wind 1 345 300.9 Wind SS Completed, FIS Started, No IA
28INR0376 Barranca Wind 2 345 298.6 Wind SS Completed, FIS Started, No IA
30INR0041 Bell Song Solar 345 167.6 Solar SS Completed, FIS Started, No IA
30INR0049 Bell Song Solar 2 345 167.6 Solar SS Completed, FIS Started, No IA
31INR0009 Bell Song Solar 3 345 167.6 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.