Rio Vista Storage
ERCOT queue ID 28INR0261
Rio Vista Storage (28INR0261) is listed in the ERCOT interconnection queue as a 103.4 MW battery project in Pecos County, TX. The filing names Tap # Pigcreek4A – # Solstice4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 2, 2030. It records the screening study as complete on September 17, 2025.
| Queue ID | 28INR0261 |
|---|---|
| Project name | Rio Vista Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap # Pigcreek4A – # Solstice4A |
| Point of interconnection | Tap 138kV #60393 Pigcreek4A – #60385 Solstice4A |
| County | Pecos |
| State | TX |
| Voltage | 138 kV |
| Capacity | 103.4 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-09-02 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Rio Vista Storage, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2025-09-17 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.