Rio Vista Solar (28INR0260) is listed in the ERCOT interconnection queue as a 553.7 MW solar project in Pecos County, TX. The filing names Tap # PigCreek4A – # Solstice4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 2, 2030. It records the screening study as complete on September 17, 2025.

Queue ID28INR0260
Project nameRio Vista Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap # PigCreek4A – # Solstice4A
Point of interconnectionTap 138kV #60393 PigCreek4A – #60385 Solstice4A
CountyPecos
StateTX
Voltage138 kV
Capacity553.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2030-09-02
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRio Vista Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2025-09-17
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first